Save Our Heritage |
Protecting the Birthplace of the American Revolution, the cradle of the Environmental Movement, and the Home of the American Literary Renaissance |
|
2012 - Interior and Site Restoration |
|
|
|
Nick laying front entry hall floor. | Front Hall Entry (Jan 2012) |
|
|
East Chamber with kitchen floor boards | Kitchen Fireplace after masonry repair. |
|
|
West chamber. | West chamber fireplace. |
|
|
Muster room fireplace closeup. | Tom thinning floor board thickness. Jan 13. |
|
|
Repairing the rear west ell sub-floor. | Justin working on door jamb. April 10. |
|
|
Selecting lumber for replacement floors and walls. March 21. | Tom re-building kitchen rear wall. April 6. |
|
|
Mike repairing west ell wall lath. April 6. | Nicholas hand planing wall boards. April 10. |
|
|
Kitchen rear wall and window. April 11. | Nicholas above east ell door. April 11. |
|
|
West ell rear subfloor structure. April 11. | Rick cleaning up in tent. August 21. |
|
|
Three-hole privy from Barrett woodshed. | Jeff and Joel surveying for drainage project. Aug 22. |
|
|
Drainage ditch to west of house. Aug 27. | Drainage ditch in back of house. Aug 27. |
|
|
Drainage ditch in back of house. Aug 28. | Drainage ditch in back of house. Aug 28. |
|
|
Joel, Rick, and Bill discuss artifacts. Aug 30. | Scattered artifacts found during drainage work. Aug 30. |
|
|
West ell rear plastered and woodwork. Aug 30. | Bridget and Rick in west ell hallway. Aug 30. |
|
|
Electricians installing underground utilities in basement. Aug 31. | Mike installing lath ceiling in rear west ell room. Sep 7. |
|
|
Drainage ditch installation. Sep 7. | Touch-up paint materials. Sep 11. |
|
|
Barrett markings on old board. | Metal plates cover historic paint layer samples. |
|
|
Catherine maintaining window sash. Sep 20. | Herb installing underground electrical cable. Sep 20. |
|
|
Eagle scout project worked on basement drainage. Sep 22. | Arthur installing west ell door handle. Sep 24. |
|
|
Electrical outlets are well hidden under the mid-plate. | Stairway and sunshine. Oct 2. |
|
|
Catherine in-painting muster room cupboard. Oct 3. | Early morning sun over the fields. Oct 8. |
|
|
Work area between barn and house. Oct 8. | House in morning. Oct 8. |
|
|
Second floor rear. Oct 19. | House. Oct 19. |
|
|
|
|